Safe Work Method Statements (SWMS)
Below are some of the Safe Work Method Statements available. SWMS can be developed to any task requested.- Air Compressor
- Asbestos Removal under 10m2
- Auger Operation (motorised and handheld)
- Residentail Plumbing Excavation
- Battery Charging
- Carpentry
- Carpet Laying
- Chainsaw Operation
- Change Water Meter or Water Meter Assembly
- Clearing Construction Track
- Concrete Pour – Pump
- Conduit Installation in Trenches
- Conduit Installation
- Confined Space Entry
- Contruction and Demolition of Buildings and Ablutions
- Crane Operation
- Electrical Isolation
- Elevated Work Platform
- Erecting Power Poles
- Excavation – Compaction – Trenching
- Fencing [swms-f01]
- Formwork [swms-f02]
- Gyprocking
- Hazardous Manual Tasks
- Hazardous Materials
- Hot Work – Welding and Cutting
- Installation of Air Ducts
- Install Ducting – Roof
- Install Edge Protection
- Install General Electrical Components
- Install General Plumbing Components
- Install of Culvert Bedding, Concrete Slab and Culverts
- Install Roof Ladder Access
- Install Services Under Roadway
- Installation of Rock Baskets
- Ladder Operations
- Operation of EWP
- Painting
- Pressure Cleaning Building
- Repair Sewage Service
- Repair Water Main
- Replace Manhole Cover
- Replace or Install Fire Hydrant
- Replace or Repair Water Main
- Risk of Falling more than 2m
- Roofing – Cladding in Proximity to HV Cables
- Setup and Pour of Pump Wells
- Sheeting of Building
- Steel Erection
- Street Light Pole Erection
- Traffic Management
- Use of Boom Lift
- Use of Chemicals and Dangerous Substances
- Use of EWP – Scissor Lift
- Use of Lifting Gear
- Waterproofing and Tiling
- Welding MIG
- Welding TIG
- Window Cleaning at Heights
- Working at Heights
- Working in Proximity to HV Cables
- Working in Proximity to Power Cables
- Working in Trenches or Excavating
- Working on Roof Tops
- Working Over or Adjacent to Water or Liquid